Project Description: The total investment of the project is 100 million yuan Construction Unit: Changsha National Biological Industry Base Development & Investment Co., Ltd. Contact Person: Mr. Liu Telephone
Longlived Stainless Steel Shot is one of the most popular Metal Abrasive with high quality and low price for shot blasting. Meanwhile, 202 Stainless Steel Shot is an very excellent one of them. Sometimes it could also called 202 Stainless Steel Cut Wire Shot or 202 Stainless Steel Shot Conditioned.
Longlived 202 Stainless Steel Shot is made from high quality 202 Stainless Steel.
Chemical Composition (%)
C
Si
Mn
P
S
Ni
Cr
N
0.78
0.76
15
0.032
0.001
4.06
14.36
0.01
Shape: as cut, G1, G2, G3 and G4.
202 Stainless Steel Shot,Sus202 Stainless Steel Shot,Ss202 Stainless Steel Shot,Stainless Steel Shot For Shot Blasting Longlived Metal Products Co ., Ltd , https://www.longlivedmetalproducts.com
Project Name: Changsha National Biological Industry Base Film and Television Conference Center Project Progress: Project Construction Period: 2011.10-2013.10
Major equipment: cranes, building materials, exterior wall decoration materials, glass doors and windows, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instrumentation, water supply and drainage systems, fire protection systems, pipe fittings, water supply Equipment, outdoor drainage, building electrical, lighting fixtures, low voltage electrical appliances, wire and cable, weak point systems, lightning protection systems, low voltage distribution cabinets.
The project is located in the National Bio-Industrial Base of Changsha City, east of the Third Line, and within a second line of latitude and weft. It covers an area of ​​24,948 square meters, including hotels, convention centers, and commercial centers.
Size: 0.25mm-3.0mm Other size also could be customized.
Changsha National Biological Industry Base Film and Television Conference Center Project (2011-2013, 100 million)
Related Developments: Tower Crane Infrastructure Project